top of page
All Articles
NORD YOUNG


Charterers Liability: The Coverage Most Charterers Do Not Carry
In October 2006, the capesize bulk carrier Ocean Victory was discharging iron ore at Kashima in Japan when weather deteriorated. A long swell combined with a northwesterly gale reaching Force 9 on the Beaufort scale. The master decided to leave the berth, lost control of the vessel in the Kashima fairway, and she was driven onto the breakwater and became a total loss. The vessel's hull insurers paid, took an assignment of the owners' and demise charterer's rights, and brought
Richard Young
Sep 158 min read


8,016 Tonnes at Yangshan: What the Green Methanol Record Actually Tells Bunker Buyers
On the weekend of August 16, the bunkering vessel Haigang Zhiyuan delivered 8,016 metric tonnes of domestically produced green methanol to the dual-fuel container ship CMA CGM Osmium at Yangshan Port in Shanghai. Shanghai Customs supervised the operation. It is the largest single green methanol bunkering on record. The operation brought together Shanghai Electric, Shanghai International Port Group, and CMA CGM, with the fuel supplied principally from Shanghai Electric's Taona
Richard Young
Aug 208 min read


Bunker Broker, Trader, or Physical Supplier: Who You Are Actually Buying From
[Photo by Bayu Tiyo on Unsplash] Ask a bunker buyer who they bought their last stem from and you will usually get a company name. Ask what that company's role was in the transaction and the answer is less certain than it should be. The confusion is widespread and it is not the buyer's fault. The three roles in marine fuel supply are genuinely distinct in law and in risk, but the market presents them inconsistently, some companies perform more than one, and the commercial conv
Richard Young
Aug 137 min read


Bunker Quantity Disputes: The Cappuccino Effect and Mass Flow Metering
Fuel is sold by mass and, for most of the industry's history, delivered by volume. That single mismatch is the origin of nearly every quantity dispute in bunkering, and it is the gap that decades of tradecraft have been built to exploit. The stakes have risen with the price. With VLSFO running past $910 per metric ton in the spring of 2026, a two percent discrepancy on a mid-sized stem costs upward of $15,000 before the vessel has left the berth. Service providers who conduct
Richard Young
Aug 109 min read
Search by Tag
bottom of page