top of page
All Articles
NORD YOUNG


Towing Contracts and the Limits of Liability: Knock-for-Knock and the Bisso Doctrine
A tug is assisting a loaded barge into a berth. The tug’s master misjudges the approach, the barge strikes the dock, and there is damage to the barge, the dock, and the cargo. Who pays depends almost entirely on two things. Which contract form governs, and which side of the Atlantic you are on. International towage has settled on a risk allocation that the United States Supreme Court declared void as a matter of public policy in 1955 and has never retreated from. That decisio
Richard Young
5 hours ago8 min read


OPA 90 for Inland Operators: The Exposure Is Larger Than the Barge
A tank barge on the Lower Mississippi carrying 30,000 barrels of product is, in insurance terms, a modest asset. The hull value is a fraction of a deepsea tanker. The crew is small. The trade is domestic and familiar. The pollution exposure attached to it is not modest, it is not limited to the value of the barge, and under a set of circumstances that are considerably easier to trigger than most operators assume, it is not limited at all. This article covers how the Oil Pollu
Richard Young
Sep 19 min read


America's New Container Port: What the Louisiana International Terminal Means for Gulf Operators
On August 17, the U.S. Army Corps of Engineers granted the federal permit authorizing construction of the Louisiana International Terminal at Violet in St. Bernard Parish, on the Lower Mississippi River downriver from New Orleans. The permit clears the last major regulatory hurdle for what Port NOLA describes as the only new greenfield container port currently under development in the United States. Construction is expected to take five years. The projected investment is roug
Richard Young
Aug 195 min read


Subchapter M: What Towing Operators Need to Know
Ten years after it took effect, Subchapter M is no longer a new regulation. It is the operating framework for the entire U.S. towing industry, and the phase-in that occupied everyone's attention between 2016 and 2022 is long finished. What has replaced it is a renewal cycle, and that cycle is producing a specific set of problems right now for operators who obtained their first Certificate of Inspection early. Requirements that were deferred for five years are coming due, and
Richard Young
Aug 68 min read
Search by Tag
bottom of page