USCG Alert: How an Air Draft Documentation Error Becomes a Bridge Allision


On 10 November the Coast Guard issued Marine Safety Alert 17-26 after investigating a deep-draft vessel that struck a bridge even though its voyage planning calculations showed sufficient vertical clearance.
The calculations were not wrong. The number going into them was.
Investigators found the vessel’s reported air draft came from outdated plans that did not reflect its current configuration. Multiple versions of the ship’s plans were held on board, and the documents used to work out the air draft did not account for an installed MF/HF tiltable antenna standing above the vessel’s reported highest point. Because the antenna was left out of the calculation, the crew did not recognize that it needed lowering. The pilot was given an understated air draft figure, which produced a margin of safety that did not exist.
The alert was developed by Coast Guard Sector Los Angeles-Long Beach and distributed by the Office of Investigations and Casualty Analysis.
A superseded drawing on a bridge shelf is a small failure. It is also the kind that reaches questions an owner would much rather keep at arm’s length.
What the Alert Recommends
The Coast Guard’s recommendations fall into two groups:
Documentation Control: Incorporate air draft verification into the safety management system, maintain current vessel-specific drawings, and clearly identify or remove superseded documentation.
Operational Procedure: Establish procedures for configuring movable equipment before transits requiring overhead clearance, and require positive confirmation that antennas and other adjustable structures have been lowered or secured.
Both are document and process controls rather than engineering ones. The equipment was installed and the antenna was designed to tilt. What failed was that the paperwork describing the ship no longer matched the ship.
This Is Not a New Concern
The Coast Guard has returned to air draft repeatedly, and the pattern matters when assessing how a claim will be viewed.
In September 2014 the Inspections and Compliance Directorate issued Safety Alert 09-14, “Air Draft is Critical.” Reporting at the time noted the Coast Guard had counted 205 air draft related accidents at bridges over the preceding eleven years, across fixed, swing, lift and drawbridges, and that towing vessels and barges were statistically the most likely to be involved. The alert stressed that specific data must be known when planning transits and that assumptions must not be made about air draft or bridge heights.
Earlier, in connection with repeated strikes on the Bayonne Bridge, the Coast Guard pursued a civil penalty against a ship’s owner and stated it would likely pursue civil penalties against any vessel owner, master or person in charge providing inaccurate information contributing to a bridge allision in the New York and New Jersey area. One of those incidents demasted a ship’s INMARSAT C and Ship Security Alert System antennas, which is close to the facts of the current alert.
More recently, Sector Virginia issued Findings of Concern 003-25 in February 2025 on bridge allisions involving uncertainty of vessel air draft, and Marine Safety Unit Lafayette issued Findings of Concern 002-26 in January 2026 on safe bridge clearance requiring real-time information, which addressed bridge clearance gauges under 33 CFR 117.47 and their calibration to local water levels.
An owner whose documentation control fails after this sequence of published guidance is in a weaker position than one facing a novel hazard.
The Presumption Runs Against the Vessel
Before any insurance question arises, the liability position starts against the ship.
The Oregon Rule. Under The Oregon, 158 U.S. 186 (1895), a moving vessel that allides with a stationary object is presumed at fault. The owner of the struck object satisfies its initial burden by establishing the allision.
Rebutting it is narrow. The moving vessel must prove, by a preponderance of the evidence, one of three things: that it used all reasonable care and was therefore without fault, that the stationary object was at fault, or that the allision was an inevitable accident. Courts have described this as a difficult presumption to overcome.
The Pennsylvania rule can compound it. Under The Pennsylvania, 86 U.S. (19 Wall.) 125 (1873), where a vessel violates a statute or regulation designed to prevent the kind of harm that occurred, the burden shifts to show the violation could not have been a cause. That rule is one route to showing a stationary object was at fault, and it also operates against a vessel whose own regulatory compliance is in question.
On the facts in Alert 17-26, the vessel struck a visible fixed bridge after its own crew supplied an understated air draft. None of the three escape routes looks promising.
Pilotage Does Not Work the Way Many Assume
This is worth setting out precisely, because the rule is often stated too simply in both directions.
The Owner’s Personal Liability: In Homer Ramsdell Transportation Co. v. La Compagnie Générale Transatlantique, 182 U.S. 406 (1901), the French steamship La Bretagne struck a pier in New York harbor while under a pilot that New York law compelled the vessel to accept. The Supreme Court held that in an action at common law the shipowner is not liable for injuries inflicted exclusively by the negligence of a compulsorily accepted pilot.
The Vessel’s Liability in Rem: That is a separate question with a different answer. Under The China, 74 U.S. (7 Wall.) 53 (1868), the vessel herself is liable in rem for a collision occasioned by the fault of a compulsory pilot. The Supreme Court noted this as a marked distinction from the English rule, which by statute exempted the vessel. One court put the combined position plainly: for the pilot’s careless navigation the owner is not liable on any theory of agency, and liability arises only in rem against the ship.
Why This Distinction May Not Assist the Owner: The alert does not establish whether the pilot was compulsory. In any event, the protection against personal liability for a compulsory pilot's negligence applies only where the damage is attributable exclusively to that pilot. Here, the crew supplied an understated air draft, introducing a potential independent basis for liability regardless of the pilotage arrangement.
The Limitation Question, and Why Documentation Reaches It
This is where a safety alert becomes an insurance article.
The Limitation of Liability Act allows a shipowner to limit liability for damages arising from a maritime incident to the post-voyage value of the vessel plus pending freight. In a serious bridge allision, the difference between limited and unlimited exposure can be very large.
The limitation turns on privity or knowledge. Where the vessel’s negligence or unseaworthiness is the proximate cause of the loss, the owner seeking limitation must prove it had no privity or knowledge of the negligent acts or unseaworthy conditions. Courts have described the standard as not requiring every possible precaution, but as obliging the owner to select a competent master and crew and to exercise reasonable care.
Where documentation failures sit in that analysis. An officer’s isolated navigational mistake is the classic case falling outside an owner’s privity. Outdated vessel drawings, undocumented modifications and the absence of an air draft verification procedure raise a different question: whether responsible shoreside personnel knew, or through reasonable diligence should have known, of the condition that contributed to the casualty. Where such deficiencies are attributable to corporate management and causally connected to the allision, they can defeat the right to limit.
The existence of outdated drawings does not establish that result on its own. The owner’s relevant knowledge has to concern the negligent act or condition that actually caused the casualty, and the publicly reported facts in Alert 17-26 do not say who was responsible for updating the plans or controlling the documents on board. But it is the question the claimants will ask, and it is one the owner has to be able to answer with evidence rather than assertion.
The Dali is the modern American reference point. Following the allision with the Francis Scott Key Bridge on 26 March 2024, the vessel interests sought exoneration from or limitation of liability, and negligence and privity or knowledge were central to that litigation. Separately, the Coast Guard convened a Ports and Waterways Safety Act Board of Inquiry, which reported in September 2026 that United States ports face growing risks from larger ships. Together those tell you the scale of scrutiny that follows a serious bridge casualty.
Which Policy Responds
Three exposures, and the first is less settled than operators often assume:
Damage to the bridge may fall to P&I or to hull, depending on your conditions. Under standard English hull conditions, liability for damage to fixed and floating objects is generally left to the P&I entry. Under Nordic and German conditions, FFO liability is commonly written inside hull and machinery cover. Which applies to your fleet is a question about your actual placement, not a general rule, and it is worth knowing before a casualty rather than after.
Damage to the vessel is hull and machinery. A demasted antenna is a modest claim. A bow damaged against a bridge pier is not.
The exposure that reaches the reinsurance layers. A serious bridge allision can generate liabilities far beyond what an individual club retains. The International Group’s pooling arrangements and its general excess of loss reinsurance program exist for losses of that scale, and the Dali casualty is the reason that structure has been discussed in connection with recent club renewal positions.
What Is Actually Recoverable
One qualification matters a great deal in the United States and is frequently omitted.
Recoverable liabilities may include repair of the damaged structure, consequential losses suffered by its owner, and other claims the law allows. But under Robins Dry Dock & Repair Co. v. Flint, 275 U.S. 303 (1927), maritime negligence generally does not permit recovery of purely economic loss by a claimant who has suffered no physical injury to a proprietary interest, subject to limited exceptions.
So the businesses affected by a waterway closure, the truckers rerouted, the suppliers delayed, are in a materially weaker position than the owner of the structure itself. That distinction shapes the size of the eventual exposure considerably, and anyone modelling a worst case should build it in rather than assuming every affected party has a claim.
Three Conditions That Shape the Outcome
The ISM and Safety Management Obligation: Club rules generally require compliance with applicable statutory and classification requirements, and the ISM Code requires documented procedures and document control. The use of superseded drawings to calculate air draft raises a document-control concern, while the effectiveness of the vessel's existing verification procedures warrants examination. Whether either deficiency affects cover depends on the club's rules and the facts. Whether that affects cover depends on the club’s rules and the facts, but it is a question the club will ask.
Losing limitation is not the same as losing cover. These are separate tests and conflating them is a common error. An owner’s privity or knowledge may defeat the right to limit liability under the Limitation Act without defeating insurance cover, because P&I exclusions generally turn on a much higher standard than negligence. Clubs distinguish conduct sufficient to break statutory limitation from the willful misconduct that excludes cover under their rules.
The practical consequence runs the other way from what people expect. A documentation failure can enlarge the liability the insurer has to respond to without leaving the owner uninsured. That is bad for the owner’s record, bad for the club, and bad at renewal, but it is not the same as a declinature.
Pilotage. As set out above, the compulsory pilotage protection operates on the owner’s personal liability and only where the pilot’s negligence is the exclusive cause. It does not touch the vessel’s liability in rem, and it does not help where the crew supplied the information that caused the casualty.
What to Do About It
Reconcile the drawings against the ship. Not a review of the drawings, a comparison of the drawings with what is physically installed. Antennas, radar arrays, masts, cranes, gangway davits and any retrofit added since delivery.
Establish a single controlled source for air draft. The alert’s finding was that multiple versions of the plans were held on board. One controlled document, every superseded version marked or removed.
Write air draft verification into the SMS. The Coast Guard recommends this expressly. The alert does not itself create a regulatory obligation, and the Coast Guard says as much about its safety alerts, but it identifies a documented risk that your existing safety management and document control procedures are supposed to catch.
Require positive confirmation, not assumption. A checklist item requiring someone to confirm that adjustable structures are lowered and secured, signed, before an overhead clearance transit.
Give the pilot a verified figure and record what you gave. The number handed over, by whom, and from what source. That record is the first thing anyone looks for afterward, and on these facts it is the document that decides where the inquiry goes.
Update the drawings when anything is installed. The failure here was not the antenna. It was that the antenna went on and the paperwork did not change. That is a change management process, and most operators have one on paper.
Review material modifications with your broker and insurers. A change that alters the vessel’s profile may warrant notification or an amendment to the arrangements. Whether it does depends on the cover and the change, which is a conversation worth having rather than a form worth filing.
Review the process, not just this vessel. If one vessel’s drawings are out of date, the system meant to keep them current did not work. That is the fleet-wide version of the problem, and it is the version that reaches shore management.
The Bottom Line
A tiltable antenna was installed. The drawings were not updated. Several versions of the plans sat on board. The crew calculated an air draft from the wrong one, gave the pilot a number that was too low, and the ship hit a bridge.
Under United States law the moving vessel is presumed at fault in an allision with a fixed object, and the escape routes are narrow. Compulsory pilotage protects an owner from personal liability only where the pilot’s negligence was the exclusive cause, and it never protects the vessel from liability in rem. Where the crew supplied the wrong figure, that protection is not available at all.
The harder question is limitation. It turns on whether the owner had privity or knowledge of the condition that caused the loss. Out-of-date drawings and inadequate verification procedures raise questions extending beyond the bridge team to the owner's shoreside management. Whether those failures defeat limitation depends on what management knew or should have known, and whether the deficiencies caused the casualty. Losing limitation does not by itself mean losing cover, since P&I exclusions sit at a much higher threshold. It means a larger liability for everyone to deal with.
The controls the Coast Guard recommends are document control and a checklist. That is an afternoon’s work against an exposure whose ceiling is set by how much a bridge costs.